U.C. Merced

Ucmerced
Bedrock Engineering provided utility and boundary research, topographic surveying, and construction staking for U.C. Merced’s 1 megawatt, 4,900 panel solar power system, and covers roughly 8.5 acres. Completed in November, 2009 by SunPower Corp., the system supplies around 2/3 of the campus’ power needs during summer and about 20% of the overall annual needs.